Due to reduction of water level in the river, the country falls short of about 400 Mega watt electricity compelling to cut the power for 63 hours per week, which may be increased more during the dry season. The new loadshedding from push 2, Tuesday will be having three shifts of power cut on 4 days, one shift in one day and two shifts for two days.
Here is the new loadshedding schedule effective from Poush 2 Tuesday (Dec 17, 2013)
Click the picture to enlarge.
0 comments
Post a Comment