SAFF 2013 pictures

Here are some pictures during Nepals game in SAFF championship 2013.

Samsung Galaxy S4- the most innovative phone

With all those features, I am sure this is gonna be an iPhone Killer and speculate new innovations and censor controls in new smartphones to come.

Top Ten unbelievable incidents in Narayan Gopal's Life.

Swor Samrat Narayan Gopal's name needs no introduction to all the Nepali out there. A legend in the Modern Music's first generation (Adhunik Geet yug) was borned today, (Oct 4) in the year 1939. Marking his birth anniversary, I am here to post top ten unknown incidents in his life (taken from film maker/writer Prakash Sayami).

Top Ten Movies of all time

I always want to read top tens in everything until now that I have started writing top ten stuffs in my blog.In this post, I am putting my own best Movies of all time. These movies are not only in the top of my favorite lists, but also are the greatest movies of all time in the history of Cinema.

CG to enter into telecom sector

Chaudhary Group, one of the biggest business house of Nepal (popular for electronic products and food/beverages) is all set to enter the telecom market with the brand name CG tel.

Showing posts with label loadshedding. Show all posts
Showing posts with label loadshedding. Show all posts

Dec 17, 2014

New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014)

NEA (Nepal Electricity Authority)- the government owned sole authority for generating and distributing electricity in the country, has announced fresh schedule of loadshedding in the country. With the new loadshedding schedule effective from December 17, 2013 (Poush 2, 2070), there will be eleven hours power cut for 2 days, 10.5 for one day and 9.5 for four days.
Due to reduction of water level in the river, the country falls short of about 400 Mega watt electricity compelling to cut the power for 63 hours per week, which may be increased more during the dry season. The new loadshedding from poush 2, Wednesday will be having two shifts of power cut ( four to 6 hours in a shift).
Here is the new loadshedding schedule effective from Poush 2 Wednesday (Dec 17, 2014)
Click the picture to enlarge.


Jun 3, 2014

New loadshedding schedule (timing) effective from Jestha 21, 2071

Nepal Electricity Authority has announced the load shedding hours to be reduced by 2 hour to 8 hours a day. The new load shedding schedule is said to be effective from Wednesday- Jestha 21, 2071 (June 4, 2014). As more electricity is produced from the hydropower plants due to increase of water level in rivers and reservoir, NEA is able to reduce the power cut hours, which is already reduced unofficially from few days. Here is the new load shedding schedule to be effective from Jestha 21, 2071. 
Click the picture to download the latest loadshedding schedule.






Dec 16, 2013

New loadshedding schedule December 17 2013 (Poush 2, 2070)

NEA (Nepal Electricity Authority)- the government owned sole authority for generating and distributing electricity in the country, has announced fresh schedule of loadshedding in the country. With the new loadshedding schedule effective from December 17, 2013 (Poush 2, 2070), there will be nine hours power cut daily, which is increment of 3 hours per day. 
Due to reduction of water level in the river, the country falls short of about 400 Mega watt electricity compelling to cut the power for 63 hours per week, which may be increased more during the dry season. The new loadshedding from push 2, Tuesday will be having three shifts of power cut on 4 days, one shift in one day and two shifts for two days. 
Here is the new loadshedding schedule effective from Poush 2 Tuesday (Dec 17, 2013)
Click the picture to enlarge.