SAFF 2013 pictures

Here are some pictures during Nepals game in SAFF championship 2013.

Samsung Galaxy S4- the most innovative phone

With all those features, I am sure this is gonna be an iPhone Killer and speculate new innovations and censor controls in new smartphones to come.

Top Ten unbelievable incidents in Narayan Gopal's Life.

Swor Samrat Narayan Gopal's name needs no introduction to all the Nepali out there. A legend in the Modern Music's first generation (Adhunik Geet yug) was borned today, (Oct 4) in the year 1939. Marking his birth anniversary, I am here to post top ten unknown incidents in his life (taken from film maker/writer Prakash Sayami).

Top Ten Movies of all time

I always want to read top tens in everything until now that I have started writing top ten stuffs in my blog.In this post, I am putting my own best Movies of all time. These movies are not only in the top of my favorite lists, but also are the greatest movies of all time in the history of Cinema.

CG to enter into telecom sector

Chaudhary Group, one of the biggest business house of Nepal (popular for electronic products and food/beverages) is all set to enter the telecom market with the brand name CG tel.

Showing posts with label NEA other hydropower projects. Show all posts
Showing posts with label NEA other hydropower projects. Show all posts

May 30, 2014

Loadshedding hours to decrease from Wednesday

Loadshedding hours is known to decrease officially from Sunday.The melting of ice in the Himalayas and the pre-monsoon has made water level in the river and reservoir, to rise significantly which has unofficially reduced the load-shedding time. Bizmandu reports the loadshedding hours to be reduced by 2 hours to 8 hours per day, quoting NEA Executive Director Arjun Kumar Karki and the new schedule to release on June 1, 2014 (Jestha 18, 2071). Earlier the power cut hours was decreased by 2 hours on May 14, 2014.
Nepal being the second richest country in the world with water resources, has the enormous potential of producing 83,000 MW but we are living under maximum 12 hours per day of load-shedding for this year 2071. According to the studies, we are running short of 550 Mega watt electricity as the production lies around 750 Mega watt. Though the biggest Hydropower project Upper Tamakoshi is in full swing to generate 456 Mega watt electricity, it is not expected to give in to the national grid before mid 2016. Until then, we will have to live under no electricity. As Industries cannot sustain and flourish without the NEA supply, whole development of the country is under seize due to the loadshedding. Even after the operation of Upper Tamakoshi hydropower, the loadshedding won't be wiped out as the demand will also increase then. So, Government need to invest more in different hydropower projects in parallel so as to remove the loadshedding completely.